|
Project Analysis | ||
Project Name: |
|
|
REPORT 1- Maturity Model Rating For This Project | ||
Level 1 - Initial
• Methodology is not being adopted
• Uncontrolled Level 2 - Managed
• Very Low adoption of methodology
• Very low level of control Level 3 - Defined
• Low adoption of methodology
• Low level of control Level 4 - Quality
• Good adoption of methodology
• Good level of control Level 5 - Optimised
• Full adoption of methodology
• Under full control |
||
REPORT 2 - Project Analysis | ||
No Data - Please Select a Project.
|
||
REPORT 3 - Project Processes Analysis | ||
Start UP Process | ||
No Data - Select the above link to enter data.
|
||
Initiating a Project | ||
No Data - Select the above link to enter data.
|
||
Planning A Project | ||
No Data - Select the above link to enter data.
|
||
Managing Stage Boundaries | ||
No Data - Select the above link to enter data.
|
||
Controlling a Stage | ||
No Data - Select the above link to enter data.
|
||
Managing Product Delivery | ||
No Data - Select the above link to enter data.
|
||
Directing A Project | ||
No Data - Select the above link to enter data.
|
||
Closing A Project | ||
No Data - Select the above link to enter data.
|