| 
	
| Project Analysis | ||
| Project Name: | 
			
			 | 
		|
| REPORT 1- Maturity Model Rating For This Project | ||
			![]() ![]() ![]() ![]() ![]() ![]() Level 1 - Initial 
				
				
				
					• Methodology is not being adopted 
			• Uncontrolled Level 2 - Managed 
				
				
				
					• Very Low adoption of methodology 
			• Very low level of control Level 3 - Defined 
				
				
				
					• Low adoption of methodology 
			• Low level of control Level 4 - Quality 
				
				
				
					• Good adoption of  methodology 
			• Good level of control Level 5 - Optimised 
				
				
				
					• Full adoption of methodology 
			• Under full control  | 
		||
| REPORT 2 - Project Analysis | ||
| 
				
				
				
				 
					No Data - Please Select a Project.
				 
				 | 
		||
| REPORT 3 - Project Processes Analysis | ||
| Start UP Process | ||
| 
				
				 
					No Data - Select the above link to enter data.
				 
				 | 
		||
| Initiating a Project | ||
| 
				
				 
					No Data - Select the above link to enter data.
				 
				 | 
		||
| Planning A Project | ||
| 
				
				 
					No Data - Select the above link to enter data.
				 
				 | 
		||
| Managing Stage Boundaries | ||
| 
				
				 
					No Data - Select the above link to enter data.
				 
				 | 
		||
| Controlling a Stage | ||
| 
				
				 
					No Data - Select the above link to enter data.
				 
				 | 
		||
| Managing Product Delivery | ||
| 
				
				 
					No Data - Select the above link to enter data.
				 
				 | 
		||
| Directing A Project | ||
| 
				
				 
					No Data - Select the above link to enter data.
				 
				 | 
		||
| Closing A Project | ||
| 
				
				 
					No Data - Select the above link to enter data.
				 
				 | 
		||